Base Laying

The ground must be flat and level with no more then 4” (100mm) fall. Bushes and obstacles must be removed.

Should extensive groundwork be required then an additional cost will be incurred.

If you have any worries a free site visit service is available.

Timber Platform Base

A timber base frame manufactured using 4”x2” 100% pressure-treated timber with bracing in each corner. Leveled up using timber legs.

Platform bases are used to level up an uneven solid surface, with no more than 4” fall, such as a slopping concrete base or uneven flagging. They cant be used on grass, dirt or gravel, as the legs will sink into the ground.

Preparing Shed Base

Measured in Feet

Timber Premium Concrete
4×6 £120£240£720
5×7 £140£280£720
6×8 £192£384£720
8×10 £280£560£1200
10×12 £420£840£1800
10×14 £490£980£2100
10×16 £560£1120£2400

For best results, we recommend a concrete base which is priced at £15 per square foot, for a minimum charge of £720.